Product Use
MTM-A Capacitive Level Gauge - Full Scale Operation Guide After Calibration Interface Upgrade
MTM-A Quality Type Level Meter - Full Scale Operation Guide After Calibration Interface Upgrade: Place the induction pen at the 9 o'clock position and hold it still until the screen displays P0, then remove it. Lightly tap the 9 o'clock position twice with the induction pen to switch the interface from P0 to P2. Place the induction pen at the 3 o'clock position and hold it still to enter the P2 full scale interface. Place the induction pen at the 3 o'clock position again and hold it to perform the full scale operation; a blinking value indicates successful calibration. Place the induction pen at the 9 o'clock position and hold it to exit the P2 menu. Wait for the 10-second countdown to finish; full scale completion is achieved.
How do you replace the battery in the SMTD differential pressure gauge from Deleetech?
SMTD differential pressure gauge battery replacement procedure: First, loosen the four screws on the top cover of the instrument, remove the top cover, and unplug the battery connector to take out the old battery. Then, place the new battery in the battery compartment, connect the plug next to the new battery, and organise the supercapacitor wiring before placing it on the side. Finally, reinstall the top cover and tighten the screws, making sure they are secure to prevent water damage to the instrument. After completing these steps, the SMTD differential pressure gauge battery replacement process is fully finished.
Page 5 of 5, 42 items total